End-of-life servers are a management decision
IT can flag them. Someone has to fund the move. Write the residual risk in business language.
ITSIGN Administrator · August 13, 2025 · 2 min read
A 2008 box running a line-of-business app is not an IT failure. It is an accepted risk that was never written down.
Put a date, a cost range, and a compensating control on one page. If they accept it, sign it. If they do not, fund the migration.
IT consulting is how we write that page so it survives a board meeting.
Related reading
Why on-site still matters in Toronto and Vancouver
Remote fixes the tenant. Hands fix the switch, the backup appliance, and the room nobody labelled.
2 min read
Your first IT hire vs an MSP
A generalist drowns in tickets and never does the project. An MSP without a named person feels like a queue. You can have both.
2 min read
Capacity before the busy season, not after the outage
Retail in November. Accounting in April. Manufacturing when the line is booked. Size for that.
2 min read
Want this applied to your environment?
A short conversation, an honest assessment of your current setup, and a clear proposal. No obligation and no pressure.
